Sanitation / public toilets
Resident problemPossible match checked — none found
No approved work found for Sanitation / public toilets in available minutes (Possible match checked — none found).
- Issue Sanitation, streets and sewers in Ward 9 (2021)
Reservation 2026: Scheduled CastesReservation 2021: Women
7,378 electors in this ward on the final roll of 22 September 2026, as reported in the press (not an official ward-wise list)
Bharatiya Janata Party · as of 14 September 2026
House attendance: 21 present · 4 missed · 25 meetings with minutes (of at least 59 known)
Marked as demolished in the gazette: Kabari Colony Ind. Area Phase-I, Colony No. 4 Ind. Area Phase-I
Chandigarh Gazette No. 162 (30 Dec 2020); boundaries unchanged for 2026 (Administrator's order No. C-593143/FII(8A)/2025/20056, endorsements dated 31 December 2025)
Place names and notes are in English, as in the sources.
| Elected as | Bharatiya Janata Party |
|---|---|
| Reported party now (14 September 2026) | Bharatiya Janata Party Not fully verified |
| House attendance | 21 of 25 meetings with published minutes 25 of at least 59 General House meetings this term (308th, 1 Feb 2022; 341st-365th, Oct 2024-Sep 2026; 350th not published) · 4 missed meetings noted |
Score withheld: data coverage 39% is below 50%
Data coverage: 39.3% of the total weight is backed by documented data
Built only from documented data with published weights. Missing data is left out, never guessed. Not a recommendation.
| Parameter | Weight | Value (0-100) |
|---|---|---|
| House attendance21 of 25 meetings with minutes; minutes for 25 of at least 59 meetings | 25 → 10.6 | |
| Ward works and fund useRs 232.88 lakh approved vs ward median Rs 232.54 lakh; minutes read for 87% of meetings; approvals only (spending not documented) | 20 → 8.7 | |
| Complaint responsiveness0 complaints with a documented outcome (needs 5) | 10 | No data: left out |
| Criminal cases and allegations0 item(s) from a news search; no affidavit yet | 20 → 10 | |
| Party switches this term0 switch(es) | 10 | |
| Affidavit disclosureno affidavit yet | 10 | No data: left out |
| Education and experienceno affidavit yet | 5 | No data: left out |
None found in our news search.
From news reports, with dates. Court, vigilance and affidavit records have not been checked yet. An allegation is not a finding of guilt.
Nominations not yet published. Candidates appear here only after the State Election Commission publishes the list of valid nominations.
Before the 2021 election Hindustan Times (17 Nov 2021) reported these key issues in Ward 9: poor sanitation and open garbage dumps, dilapidated streets and choked sewers, inadequate water supply and dangling electricity wires. Current status not verified.
First reported 17 November 2021 · last checked 14 November 2026 · No official response found
Status may be out of dateEach work is shown at the stage documented: approved, tendered, started, completed or inaugurated. Approved does not mean done or spent. Approvals come from the MC's Finance and Contract Committee and House minutes; later stages from the MC's own posts. Works shared with other wards are listed but not added to this ward's total.
Totals cover 1 February 2025 to 14 November 2026. Minutes were available for 33 of 38 meetings in that period. F&CC 352, 355, 356 and 366 and House 350 minutes were not published on the MC website when checked (14 Nov 2026).
| Category | Works approved | Rs lakh approved |
|---|---|---|
| Water supply and tubewells | 3 | 169.92 |
| Community centres | 3 | 50.41 |
| Footpaths and paver blocks | 1 | 6.31 |
| Parks and green belts | 1 | 6.24 |
| Total | 8 | 232.88 |
14 August 2026Work startedWater supply and tubewellsOfficial
Village Daria: Boring started for the 2nd of 5 sanctioned new tubewells
Vendor: not named in available minutes / AOC
Amount not stated · Area councillor named in the post. No amount in the post.
MC Chandigarh on X, 2026-08-14 (opens the publisher's site in a new tab)
24 June 2026ApprovedWater supply and tubewellsOfficial
Thé work of providing and laying of 4" i/d & 6" i/d D.!. Water Supply pipe jine near Slaughter House and from Plot No.136-140/1 to Plot No,136-140/99 to overcome the low pressure problem in distribution pocket of Industrial Area Phase-I, Chandigarh
Vendor: not named in available minutes / AOC
Rs 23.47 lakh
F&CC meeting 363, item 6, page 60, 24 June 2026 (opens the publisher's site in a new tab) read by OCR
30 December 2025ApprovedWater supply and tubewellsOfficial
Providing and fixing of 4" i/d & 6 i/d DI water supply pipelines in lieu of old rusted/damaged CI Water Supply pipelines at Deen Dayal Upadhyay Colony, Industrial Area Phase-l, Chandigarh and other contingent works
Vendor: not named in available minutes / AOC
Rs 78.29 lakh
House meeting 356, item 4, page 67, 30 December 2025 (opens the publisher's site in a new tab) read by OCR
30 December 2025ApprovedWater supply and tubewellsOfficial
Providing and fixing of 4" i/d & 6 i/d DI water supply pipeline in place of old damaged C.I. Water Supply pipeline backside Haryana Roadways, from Plot No. 182/29 to 182/84 at Industrial Area Phase-I, Chandigarh
Vendor: not named in available minutes / AOC
Rs 68.16 lakh
House meeting 356, item 5, page 67, 30 December 2025 (opens the publisher's site in a new tab) read by OCR
The MC does not publish how much of each ward's fund was spent. Figures below are as reported, with their source type.
Ward-linked awards only. City-wide and multi-sector contracts appear once on the city Contractors table — this ward shows a link when they overlap its areas.
Counts for the last 12 months: 25 November 2025 to 25 November 2026
Coverage: only complaints we found in news reports and public posts. The MC publishes no ward-wise complaint data, so this is not a count of all complaints.
Problems with services the MC does not run (electricity, police and traffic, Housing Board, UT departments) are listed for awareness. They do not count against the councillor in the record meter, unless the source shows the councillor was asked to act.
No complaints found in our sources for this period.
Charts use sourced minutes and public posts only. Not advice on how to vote.
| Stage | Works approved |
|---|---|
| Approved | 8 |
| Tendered | 0 |
| Work started | 1 |
| Completed | 0 |
| Inaugurated | 0 |
Total approved ₹232.88 lakh (ward-scope).
| Label | Value | Unit |
|---|---|---|
| Water supply and tubewells | 169.92 | ₹ lakh |
| Community centres | 50.41 | ₹ lakh |
| Footpaths and paver blocks | 6.31 | ₹ lakh |
| Parks and green belts | 6.24 | ₹ lakh |
| Year | Works approved | ₹ lakh |
|---|---|---|
| 2025 | 2 | 146.45 |
| 2026 | 6 | 86.43 |
Record meter · Documented data only · missing left out · not a recommendation
No complaints found in our sources for this period.
Sanitation, streets and sewers in Ward 9 (2021) — Before the 2021 election Hindustan Times (17 Nov 2021) reported these key issues in Ward 9: poor sanitation and open garbage dumps, dilapidated streets and choked sewers, inadequate water supply and dangling electricity wires. Current status not verified.
First reported 17 November 2021 → last checked 14 November 2026
41 sourced promise/benchmark row(s). Status from category/tag match to works — never a score. 41 pending review
Sourced from contemporary news reports of manifesto releases and campaign press conferences. Party manifesto PDFs and some SLB figures were not always available with a clear citation.
9 sourced rows
In progress2021 manifestoAAPPending review
24/7 water without additional tax
24/7 supply without putting any additional tax burden on citizens
“ensuring 24/7 supply without putting any additional tax burden on citizens”
4 linked works
Hindustan Times, 2 Nov 2021: AAP — 24/7 water (opens the publisher's site in a new tab) · 2 November 2021
In progress2021 manifestoAAPPending review
Beautify all wards especially rural
Beautify all the wards, especially rural areas
“AAP also promised to beautify all the wards, especially rural areas.”
11 linked works
Hindustan Times, 12 Dec 2021: AAP — ward beautification (opens the publisher's site in a new tab) · 12 December 2021
In progress2021 manifestoAAPPending review
Proper parking in markets and residential areas
Proper parking arrangements in markets and residential areas
“proper parking arrangements will be made not only in the markets, but also in residential areas”
13 linked works
Hindustan Times, 12 Dec 2021: AAP — parking (opens the publisher's site in a new tab) · 12 December 2021
In progress2021 manifestoBJPPending review
24×7 water supply and new pipes
New pipes worth Rs 600 crore in all wards by 2023; 24×7 water supply
“New pipes worth Rs 600 crores to be installed in all wards”
4 linked works
Indian Express, 16 Dec 2021: BJP manifesto highlights — Jal-Jeevan / 24×7 (opens the publisher's site in a new tab) · 16 December 2021
In progress2021 manifestoBJPPending review
Sound-proof community centres
Sound-proof community centres in villages, colonies and sectors
“Sound proof community centers in all villages, colonies and sectors”
4 linked works
Indian Express, 16 Dec 2021: BJP manifesto highlights — community centres (opens the publisher's site in a new tab) · 16 December 2021
In progressMaster Plan 2031Pending review
Master Plan — basic amenities in villages
Piped drinking water, sewerage, storm water drainage in villages
“basic amenities like piped drinking water supply, sewerage system,storm water drainage etc”
6 linked works
Chandigarh Master Plan 2031 — Villages PDF (official) (opens the publisher's site in a new tab) · 21 November 2026
In progressMC budget / WDFPending review
Capital — roads and parking ₹135 crore
₹135 crore under capital works for roads and parking places
“The largest allocation – ₹ 135 crore – under capital works has been proposed for improvement of roads and parking places.”
9 linked works
Hindustan Times, 18 Feb 2026: roads/parking allocation (opens the publisher's site in a new tab) · 18 February 2026
In progressMC budget / WDFPending review
Capital — storm water drainage ₹47 crore
₹47 crore for storm water drainage system
“a provision of ₹ 47 crore has been made for storm water drainage system”
2 linked works
Hindustan Times, 18 Feb 2026: storm drainage allocation (opens the publisher's site in a new tab) · 18 February 2026
In progressMC budget / WDFPending review
Capital — water supply ₹55 crore
₹55 crore for augmentation of the city’s water supply system
“A provision of ₹ 55 crores has been made for the augmentation of the city’s water supply system”
4 linked works
Hindustan Times, 18 Feb 2026: water supply allocation (opens the publisher's site in a new tab) · 18 February 2026
Problems and benchmark topics with no matching approved work in available minutes. This is not a score and does not name blame where coverage is incomplete.
Coverage (required on every gap). No approved work found in available minutes (33 of 38 House/FCC meetings read). attendance present lists known for 25 of at least 59 meetings. F&CC 352, 355, 356 and 366 and House 350 minutes were not published on the MC website when checked (14 Nov 2026). Unread minutes may still contain work. Social-only posts are leads, not verified demand.
Resident problemPossible match checked — none found
No approved work found for Sanitation / public toilets in available minutes (Possible match checked — none found).
Resident problemPossible match checked — none found
No approved work found for Sewerage / drainage in available minutes (Possible match checked — none found).
Promise / benchmarkPossible match checked — none found
No approved work found for benchmark CCTV / cameras in available minutes (Possible match checked — none found).
Promise / benchmarkNo matching approved category
No approved work found for benchmark Garbage / solid waste in available minutes (No matching approved category).
Promise / benchmarkNo matching approved category
No approved work found for benchmark MC parking lots in available minutes (No matching approved category).
Promise / benchmarkPossible match checked — none found
No approved work found for benchmark Public toilets in available minutes (Possible match checked — none found).
For awareness only
Non-MC bodies (police, CPDL, …) do not count as “not even attempted” against the councillor.
AwarenessCPDL
Electricity: listed for awareness only (CPDL); does not count as not-even-attempted against the councillor.
AwarenessUT Health Dept
Health services: listed for awareness only (UT Health Dept); does not count as not-even-attempted against the councillor.
AwarenessUT Education Dept
Government schools: listed for awareness only (UT Education Dept); does not count as not-even-attempted against the councillor.
AwarenessChandigarh Housing Board
Housing Board: listed for awareness only (Chandigarh Housing Board); does not count as not-even-attempted against the councillor.
Nothing here yet.
Try another filter, or browse the latest news.
Headlines and short summaries as published by each outlet, with a link to the original. Places are linked automatically by name and may be wrong.